Solution 01

Automation & retrofit

Reuse the mechanical base when it still makes sense, and selectively replace controls, sensors, drives, HMIs and interfaces when they limit performance, safety or maintainability.

Describe the need →
Automation & retrofitSYNTAVER · Automation & retrofit

When this solution makes sense

Signals we look for on site.

We favour maintainable architectures, components available in Europe and an automation level consistent with the client’s real ROI.

01

Repetitive or physically demanding manual tasks

Repetitive handling, loading or transfer that consumes operator time without adding value.

02

Insufficient or unstable throughput

Cycle variability, micro-stops or poor synchronisation between subassemblies.

03

Useful equipment with ageing controls

Mechanical base still usable but PLC, HMI, drives or components are becoming difficult to maintain.

04

Product or format changes

Long changeovers, manual settings or missing structured recipes.

05

Missing data or traceability

Production data, alarms or stop causes not available to operations.

Typical scope

What the project can include.

01

Functional scoping and on-site survey

02

Automation / motion / robotics architecture

03

Mechanical and electrical interface study

04

PLC / HMI programming and sequences

05

FAT, installation, SAT and ramp-up

06

Documentation and maintenance handover

Technical depth

Open the technical layer that matches your question

These items do not replace a site survey; they show the level of detail used to scope a pre-study.

01Data to collect+
  • Actual and target cycle time
  • Operating modes and shutdown windows
  • Actuator / sensor / drive list
  • Drawings, schematics and PLC backup if available
02Possible building blocks+
  • PLC / HMI / motion
  • Robot or cobot when justified by the task
  • Conveying, indexing, gripping
  • Safety, interlocks and degraded modes
03Useful deliverables+
  • Functional note and operating sequence
  • Architecture and interface list
  • Migration / shutdown / restart plan
  • FAT/SAT pack and maintenance handover
04Acceptance criteria+
  • Throughput and cycle stability
  • Changeover time
  • Stop rate or stop causes visible
  • Restart, backup and maintenance modes validated

Method

Three scoping steps before integration.

The objective is to reduce grey zones before placing orders or starting on-site work.

01

1. Survey the existing line

Mechanical base, interfaces, obsolescence, safety and current throughput.

02

2. Freeze the useful scope

Functions to automate, acceptable downtime, expected gains and acceptance criteria.

03

3. Prepare the integration

Modules, shutdown plan, testing and restart.