Resources

Technical notes for deciding before buying.

Technical notes on retrofit, machine safety, sourcing, validation, vision, intralogistics, agri-food sorting and automation economics.

No generic thought-leadership: each note starts from a real project decision — scoping, architecture, compliance, validation or ROI.

Company document

SYNTAVER company brochures - EN / FR

A printable summary of our positioning, technical capabilities, applications, project method and service area.

01
Retrofit

Retrofit or replacement: 7 questions before making the decision.

A decision framework to avoid replacing a machine that still has a solid future — or extending equipment that has become structurally risky.

10 September 20268 min→
02
Machine safety

Machine safety: what to prepare before 2027.

An operational view of the documents, safety functions and validation points to prepare when a machine is modified or integrated.

10 September 20269 min→
03
Industrial sourcing

Europe–Asia sourcing: 6 pieces of evidence to obtain before approving a supplier.

Price, CE marking and polished sales documentation are not enough. These are the elements that actually reduce integration risk.

10 September 20268 min→
04
Validation

FAT / SAT: how to stop acceptance from becoming a last-minute negotiation.

A simple method for turning specifications into testable criteria before the equipment reaches site.

10 September 20267 min→
05
Machine vision

Industrial vision: start with real defects before choosing the camera.

Lighting, product variability, false rejects and data: the decisions that matter before talking about megapixels.

10 September 20267 min→
06
Project economics

Automation ROI for an SME: do not reduce the calculation to labour hours.

Throughput, scrap, downtime, maintenance, ergonomics and capacity: a more complete view of the value created.

10 September 20268 min→
07
Intralogistics

Warehouse automation: measure the flow before choosing the technology.

Eight data points to collect before deciding between assisted picking, conveyors, routing automation or a wider intralogistics project.

10 September 20268 min→
08
Agri-food sorting

Agri-food optical sorting: build the product sample before choosing the camera.

A practical method for scoping optical sorting when size, colour, surface defects, moisture and seasonality all change the image.

10 September 20268 min→

Editorial approach

Show how we reason before showing what we sell.

Field dataMeasurements, constraints, interfaces.
EvidenceDocuments, tests, acceptance criteria.
DecisionScope, ownership, total cost.